It's getting crowded outside. What to do with perfectly good shower doors and a bathroom sink? Fabrizio and Gabriella may have a taker for the doors.
The sink has arrived. The rest of the tiles have arrived. The grounded wires for electricity have been installed, dug into the ground, and covered with cement. The pipes in the walls and floor are covered in cement and the walls and floor are all smoothed and level. Tomorrow is tile day (piastrelle) and it is smooth sailing from thereĀ… We got an estimate today that everything would be installed by Monday. One week? Is that possible?